Prepare for Spring with a New Roof Installation: February Forecast

February 6, 2025
Blogs , Repairs , Roofing , Roofing Finance

As February unfolds, the promise of spring is in the air. While winter’s chill may still linger, it’s the ideal time to begin preparing your home for the warmer months ahead. One crucial aspect of this preparation is assessing the condition of your roof. A sound roof is essential for protecting your home from the elements, and February offers a unique window of opportunity for a new roof installation, ensuring your home is ready for the spring showers and beyond. 

Assessing Your Roof’s Condition

Before committing to a new roof, it’s essential to assess the current state of your existing roof. Look for these telltale signs of wear and tear:

  • Missing or Damaged Shingles: Curled, cracked, or missing shingles are a clear indication of roof damage.
  • Granule Loss: Granules from asphalt shingles protect the underlying layers. Excessive granule loss, often visible in gutters or downspouts, suggests the shingles are nearing the end of their lifespan.
  • Leaks or Water Stains: Water stains on ceilings or walls are a serious sign of a leaking roof.
  • Sagging or Warping: A sagging or warped roofline indicates structural issues that require immediate attention.
  • Moss or Algae Growth: While not always a sign of immediate failure, excessive moss or algae growth can trap moisture and damage shingles.

Contact Allied Roofing and Construction at (973) 851-2768 today!

The Roof Installation Process: What to Expect

A new roof installation is a significant undertaking, and understanding the process can help you prepare and minimize disruptions:

  1. Consultation and Estimate: The first step is to contact a reputable roofing contractor for a consultation and estimate. The contractor will inspect your roof, discuss your options, and provide a detailed proposal.
  2. Material Selection: Choose the roofing material that best suits your budget, aesthetic preferences, and local climate. Asphalt shingles are the most common choice, but other options include metal roofing, tile roofing, and wood shakes.
  3. Scheduling: Once you’ve approved the estimate and selected your materials, the contractor will schedule the installation. Weather conditions can sometimes impact scheduling, so flexibility is important.
  4. Tear-Off: The existing roof will be removed down to the sheathing. This process can be noisy and create some debris, so it’s important to inform your neighbors.
  5. Sheathing Inspection and Repair: The sheathing, which forms the base of the roof, will be inspected for damage and repaired or replaced as needed.
  6. Underlayment Installation: A waterproof underlayment is installed over the sheathing to provide an additional layer of protection against leaks.
  7. Shingle Installation: The new shingles are installed, starting at the bottom and working upward. Flashing is installed around chimneys, vents, and other roof penetrations to prevent water intrusion.
  8. Cleanup: The contractor will clean up the job site, removing debris and disposing of old roofing materials.
  9. Final Inspection: A final inspection will be conducted to ensure the roof is installed correctly and meets all building codes.

Did You Know?

A properly installed roof can last for 20-30 years or even longer, depending on the materials used and the climate.

Ready to prepare your home for spring with a new roof installation? Contact Allied Roofing and Construction at (973) 851-2768 for a free consultation and estimate. Our experienced team will guide you through the process and ensure your home is protected for years to come.